Schmittentunnel

Project-related data

Country
Austria
Building / Object
Road Tunnel
dibit-service
Tunnel Scanning As-Built
Service detail
tunnel length: 5,111 km
Customer / Builder / Operator
Land Salzburg
Referat 6/06 - Straßenbau
Execution period
11/2020 - 12/2020

Project description

The Schmitt Tunnel is the bypass tunnel of Zell am See and road tunnel of the Pinzgauer Straße (B 311) in the province of Salzburg. The tunnel has a length of 5,111 meters and runs west parallel to the north-south through-town of Zell am See. Completed in 1996, the tunnel is single-tube and has two lanes. In the period from 2023 to 2030, escape and rescue routes will be retrofitted in the Schmitt Tunnel and, in parallel, operational and safety measures (E&M refurbishment) will be upgraded. In order to be able to plan and coordinate this work efficiently, a tunnel scanner survey is to be carried out as a basis for planning and also serves to document the structural condition.

 
 
 

dibit Projects

During the last years Dibit Messtechnik GmbH has successfully executed numerous projects at home and abroad. We have assorted a choice of authoritative projects in the following areas for you:

Our Reference List

Dibit Messtechnik GmbH provides services in the field of surveying and sells or rents customized dibit solutions to its customers.

Reference Projects

 
 

Schmittentunnel

Project-related data

Country
Austria
Building / Object
Road Tunnel
dibit-service
Tunnel Scanning As-Built
Service detail
tunnel length: 5,111 km
Customer / Builder / Operator
Land Salzburg
Referat 6/06 - Straßenbau
Execution period
11/2020 - 12/2020

Project description

The Schmitt Tunnel is the bypass tunnel of Zell am See and road tunnel of the Pinzgauer Straße (B 311) in the province of Salzburg. The tunnel has a length of 5,111 meters and runs west parallel to the north-south through-town of Zell am See. Completed in 1996, the tunnel is single-tube and has two lanes. In the period from 2023 to 2030, escape and rescue routes will be retrofitted in the Schmitt Tunnel and, in parallel, operational and safety measures (E&M refurbishment) will be upgraded. In order to be able to plan and coordinate this work efficiently, a tunnel scanner survey is to be carried out as a basis for planning and also serves to document the structural condition.