TSC Tumpen

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning Audit, Tunnel Scanning Inspection
Service detail
tunnel length: about 800 m
Customer / Builder / Operator
BeMo Tunneling GmbH
Execution period
03/2022

Project description

The approximately 800m long inner shell is to be recorded in true color by means of high-resolution tunnel scans. The purpose of the tunnel scan is to inspect the concrete surface for cracks and other damaged areas, so absolute positional accuracy plays only a diminished role.

 

 

 
 
 

dibit Projects

During the last years Dibit Messtechnik GmbH has successfully executed numerous projects at home and abroad. We have assorted a choice of authoritative projects in the following areas for you:

Our Reference List

Dibit Messtechnik GmbH provides services in the field of surveying and sells or rents customized dibit solutions to its customers.

Reference Projects

 
 

TSC Tumpen

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning Audit, Tunnel Scanning Inspection
Service detail
tunnel length: about 800 m
Customer / Builder / Operator
BeMo Tunneling GmbH
Execution period
03/2022

Project description

The approximately 800m long inner shell is to be recorded in true color by means of high-resolution tunnel scans. The purpose of the tunnel scan is to inspect the concrete surface for cracks and other damaged areas, so absolute positional accuracy plays only a diminished role.