Reit tunnel:
The Reit tunnel is located on the A10 Tauern motorway and was built during the construction of the A10 in the 1970s. It consists of 2 tubes (401 and 430 m) with 2 lanes each. It is a standard vault cross-section with a clear height of 4.7 m. The tunnel underwent in-depth rehabilitation in 2020 and 2021 (electromechanical equipment, coating, raised shoulder, concrete pavement, etc.). Prior to the work, a tunnel scan was already carried out as a basis for planning.
The Flachau enclosure:
The Flachau enclosure is located on the A10 Tauern freeway and was built in the course of environmental relief measures in 2008 - 2010. It consists of two tubes (852 and 492 m), with galleries built as box sections before and after the vault cross-section on the Villach lane. The clear height is 4.7 m. No tunnel scans have been carried out yet.
During the last years Dibit Messtechnik GmbH has successfully executed numerous projects at home and abroad. We have assorted a choice of authoritative projects in the following areas for you:
Dibit Messtechnik GmbH provides services in the field of surveying and sells or rents customized dibit solutions to its customers.
Reit tunnel:
The Reit tunnel is located on the A10 Tauern motorway and was built during the construction of the A10 in the 1970s. It consists of 2 tubes (401 and 430 m) with 2 lanes each. It is a standard vault cross-section with a clear height of 4.7 m. The tunnel underwent in-depth rehabilitation in 2020 and 2021 (electromechanical equipment, coating, raised shoulder, concrete pavement, etc.). Prior to the work, a tunnel scan was already carried out as a basis for planning.
The Flachau enclosure:
The Flachau enclosure is located on the A10 Tauern freeway and was built in the course of environmental relief measures in 2008 - 2010. It consists of two tubes (852 and 492 m), with galleries built as box sections before and after the vault cross-section on the Villach lane. The clear height is 4.7 m. No tunnel scans have been carried out yet.