Limberg 3

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning As-Built
Service detail
tunnel length: about 5 km
Customer / Builder / Operator
VERBUND Hydro Power GmbH
Execution period
03/2022

Project description

The existing access and transport tunnel Lärchenwand/Schrahnbachtunnel, which leads to the powerhouse Limberg III, is to be scanned. Most of the tunnel is shotcrete surface. The scan will serve as the basis to perform a clearance and transportation analysis to ensure that large components will fit through the tunnel.

 
 
 

dibit Projects

During the last years Dibit Messtechnik GmbH has successfully executed numerous projects at home and abroad. We have assorted a choice of authoritative projects in the following areas for you:

Our Reference List

Dibit Messtechnik GmbH provides services in the field of surveying and sells or rents customized dibit solutions to its customers.

Reference Projects

 
 

Limberg 3

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning As-Built
Service detail
tunnel length: about 5 km
Customer / Builder / Operator
VERBUND Hydro Power GmbH
Execution period
03/2022

Project description

The existing access and transport tunnel Lärchenwand/Schrahnbachtunnel, which leads to the powerhouse Limberg III, is to be scanned. Most of the tunnel is shotcrete surface. The scan will serve as the basis to perform a clearance and transportation analysis to ensure that large components will fit through the tunnel.